General Contractor for removal and replacement of 17 EA 120’ tall High Mast Lighting poles at all interchanges of I-90 & I-25 for Buffalo, WY. Work included traffic control, drilled shaft foundations, service point upgrades, new poles & luminaries.
General Contractor for removal & replacement of 31 EA Variable Message Signs, & 82 EA Lane Use Signs along with control cabinets and electrical modifications for CDOT in the Hanging Lake Tunnels on I-70 near Glenwood Springs, CO.
Subcontractor for installation of Musco sports lighting system at Kelly Walsh track & field. Work included drilled shaft foundations, conduit, 80’ steel monopole cell tower installation, wiring & luminaires.
Subcontractor for installation of electrical, ITS and sign structures on reconstruction of I-25 in Casper, WY. Work included drilled shaft foundations, trenching, conduit, 120’ tall high mast lighting, steel erection, variable speed limit signs, communications towers, a traffic signal, RWIS (Road Weather Information System), and road closure systems.
General Contractor for installation of 100’ tall self-supported communications tower. Work included foundation design and construction, erection of steel tower cable ladder, antenna mounting brackets, and conduit installation.