Subcontractor for installation of Musco sports lighting system at Kelly Walsh track & field. Work included drilled shaft foundations, conduit, 80’ steel monopole cell tower installation, wiring & luminaires.
Complete electrical and low voltage systems historic renovation and addition to Wyoming’s largest high school. Work included all electrical and low voltage systems and historic preservation and renovation work. Multi-year project of 150,000 square feet of renovation and 150,000 square feet of new addition. Casper Electric was brought in during the design phase of the project by the General CMAR.
General Contractor for installation of 100’ tall self-supported communications tower. Work included foundation design and construction, erection of steel tower cable ladder, antenna mounting brackets, and conduit installation.
General Contractor for removal & replacement of 31 EA Variable Message Signs, & 82 EA Lane Use Signs along with control cabinets and electrical modifications for CDOT in the Hanging Lake Tunnels on I-70 near Glenwood Springs, CO.
General Contractor for removal and replacement of 17 EA 120’ tall High Mast Lighting poles at all interchanges of I-90 & I-25 for Buffalo, WY. Work included traffic control, drilled shaft foundations, service point upgrades, new poles & luminaries.