Subcontractor for installation of a 2 MW diesel generator. Work included duct bank, medium voltage switch gear, utility cutover, and controls wiring for backup up generator.
Subcontractor for installation of electrical, ITS and sign structures on reconstruction of I-25 in Casper, WY. Work included drilled shaft foundations, trenching, conduit, 120’ tall high mast lighting, steel erection, variable speed limit signs, communications towers, a traffic signal, RWIS (Road Weather Information System), and road closure systems.
General Contractor for removal & replacement of 31 EA Variable Message Signs, & 82 EA Lane Use Signs along with control cabinets and electrical modifications for CDOT in the Hanging Lake Tunnels on I-70 near Glenwood Springs, CO.
100,000 square feet, four story hospital entrance with new lobby, administration offices, patient rooms, as well as labor, delivery and recovery rooms and a drive-up, drop-off area.