Serving the Electrical Needs of Wyoming for More Than Three Decades

Category Archives: Projects

Oil Field Total Flow Skids

  • IMG_4089
  • IMG_4090
  • IMG_4098
  • IMG_4099

Control panel design and fabrication.  Installation of control equipment, instruments and alarming.  Skid electrical design and layout.

Completion date: Fall of 2017

Natrona County High School

  • NCHS 1.1
  • NCHS 2.1

Complete electrical and low voltage systems historic renovation and addition to Wyoming’s largest high school.  Work included all electrical and low voltage systems and historic preservation and renovation work.  Multi-year project of 150,000 square feet of renovation and 150,000 square feet of new addition.  Casper Electric was brought in during the design phase of the project by the General CMAR.

Completion Date:  Winter 2017

WYDOT – Casper Traffic Signals Communication Upgrades

  • Casper Signals 1.1
  • Casper Signals 2.1
  • Casper Signals 3.1

General Contractor for installation of point to point wireless radio system for 55 intersections of traffic signals in Casper, WY.

Completion Date:  Fall 2017

WYDOT – Casper Marginal (I-25 from Poplar to Wardwell Rd.)

  • Casper Marginal 1.1
  • Casper Marginal 2.1
  • Casper Marginal 3.1
  • Casper Marginal 4.1
  • Casper Marginal 5.1

Subcontractor for installation of electrical, ITS and sign structures on reconstruction of I-25 in Casper, WY.  Work included drilled shaft foundations, trenching, conduit, 120’ tall high mast lighting, steel erection, variable speed limit signs, communications towers, a traffic signal, RWIS (Road Weather Information System), and road closure systems.

Completion Date:  Fall 2016